Circular demountable steel structure
- CO2 savings 27 kg
- Reuse potential Above average
- Category Realized
- Realized 2026
Metron Vastgoed, in partnership with Circulairstaal®, is realizing the new construction of Crossfit Twee12 in Nijverdal. This hall will be equipped with a circular and demountable steel structure!
The construction started in mid-2020, and in January 2021, this new crossfit facility with on-site physiotherapy was put into use.
