Het Heineken Bedrijf

  • CO2 savings 262 kg
  • Reuse potential Above average
  • Category Realized
  • Realized 2025

On behalf of De Vries en Verburg, the 'circular Brinkies' have been working on the construction of the new R&D headquarters for Heineken Global Supply Chain in Zoeterwoude for several weeks. We not only supply and assemble the steel structure, but also assemble all prefab concrete and wooden components. The building was designed by Royal Haskoning.

Beautiful green

..and not only the bottles of Heineken are green, but also the steel construction. Heineken has consciously opted for a significant CO2 reduction through the use of XCARB™. This was supplied by ThyssenKrupp Materials Nederland.