Circular steel construction
- CO2 savings 900 kg
- Reuse potential Above average
- Category Realized
- Realized 2026
In collaboration and commissioned by Burgland Bouw, we have delivered a circular steel structure for GLP in Venray
The distribution center, with a GFA of approximately 32,000m2, consists of a warehouse including a mezzanine, loading docks, loading pit, and two office buildings are being realized.
The project is being built BREEAM Excellent and Circular Building. A great ambition of the client, to which we have been able to contribute our expertise.
